As South Africa’s largest port and the busiest container hub in Africa, the Port of Durban handles over 3.5 million twenty-foot equivalent units (TEUs) annually. It accounts for 60% of South Africa’s import trade and 40% of its export trade, connecting the African continent to more than 140 countries worldwide via its shipping network. It serves as a core transit node for mineral resources (gold, diamonds), agricultural products (maize, wine), and manufactured goods. However, in recent years, the Port of Durban has been plagued by frequent strikes and power supply crises. Driven by escalating domestic labor disputes and the power crisis at Eskom (South Africa’s national power utility), the port experiences 3–5 strikes annually, with the longest single strike lasting up to 14 days. In terms of power supply, “load shedding” (planned power outages) occurs on over 200 days per year, with power cuts lasting up to 8 hours per day in port operation areas. These issues have pushed the cargo detention rate to 25%, with an average emergency handling cost of over USD 100,000 per incident. Based on the operational pain points of the Port of Durban, this article establishes a three-tier emergency response framework (“Risk Early Warning – Emergency Response – Recovery Assurance”) and provides scenario-specific response strategies supported by practical cases to help enterprises mitigate supply chain disruption risks.
I. Current Situation and Causes of Strikes and Unstable Power Supply at the Port of Durban
(1) Frequent Strikes: Inevitable Outcome of Overlapping Labor Disputes and Industry Characteristics
Strikes at the Port of Durban are primarily initiated by port worker unions, such as the South African Transport and Allied Workers Union (SATAWU) and the United Transport and Allied Trade Union (UTATU). Core demands focus on three areas: salary benefits, working conditions, and job security. The following table outlines typical strike incidents and their impacts over the past three years:
| Strike Date | Initiating Union | Core Demands | Duration | Impact Scope | Estimated Economic Loss | 
| May 2022 | SATAWU | 8% salary increase (employers only offered 5%), improved port safety facilities | 7 days | Full shutdown of container terminals, partial shutdown of bulk cargo terminals | USD 1.2 billion (due to delayed South African exports) | 
| August 2023 | UTATU | Opposition to layoffs from port automation, demand for increased overtime pay | 14 days | Complete shutdown of all terminals, over 100,000 TEUs of cargo backlogged in yards | USD 2.8 billion | 
| March 2024 | Port Administrative Staff Union | Higher provident fund contribution ratio, optimized remote work policies | 3 days | Delays in customs document verification, 50% drop in vessel berthing efficiency | USD 450 million | 
The underlying causes of frequent strikes include:
- Failure of Labor Negotiation Mechanisms: Annual salary negotiations between South African port operators (e.g., Transnet National Ports Authority, TNPA) and unions often deadlock. The breakdown rate reached 70% between 2022 and 2024, primarily because TNPA, constrained by South Africa’s government austerity policies, cannot meet union demands for salary increases (unions typically demand 7%–9% annual increases, while TNPA’s maximum offer is 6%).
- Job Anxiety from Port Automation: Since 2021, the Port of Durban has launched an “Automated Terminal Upgrade Plan,” aiming to increase container terminal automation to 40% within 5 years. This plan is expected to eliminate 1,500 traditional jobs, triggering strong opposition from workers and becoming the direct trigger for the longest strike in 2023.
- Worsening Working Conditions Fueling Discontent: Some terminal facilities at the Port of Durban are outdated (e.g., cranes at Container Terminal No. 2 have an average service life of over 25 years). During summer, when daily temperatures exceed 35°C, effective cooling equipment is lacking. In 2023, the absenteeism rate due to heatstroke reached 12%, further escalating labor tensions.
(2) Unstable Power Supply: Transmission of National Energy Crisis to the Port
The Port of Durban’s power supply is entirely dependent on Eskom. Plagued by aging coal-fired power plants (power generation efficiency dropped to 55%) and insufficient maintenance funds (a USD 3 billion funding gap in 2024), Eskom has implemented a “load shedding” system since 2020, dividing national power supply into 8 stages (Stage 1 to Stage 8), with longer outages for higher stages. Specific impacts on the Port of Durban include:
- Normalization of Operational Disruptions: When load shedding reaches Stage 3 or higher, ports must shut down 50% of equipment such as cranes and forklifts, reducing container handling efficiency from 30 TEUs per hour to 12 TEUs per hour. In 2023, power outages caused a total of 1,820 hours of operational disruption, directly leading to 12,000 TEUs of cargo detention.
- Increased Risks for Refrigerated Cargo: The Port of Durban’s refrigerated container yard (Reefer Yard) relies on uninterrupted power. During load shedding, backup generators are activated, but their capacity only meets 60% of refrigerated container needs. During Stage 6 load shedding in January 2024, over 200 refrigerated containers spoiled (primarily meat and fruits) due to power failure, resulting in losses exceeding USD 5 million.
- Delays in Customs Clearance: The port’s customs electronic declaration system (Customs Control System) switches to backup power during outages, slowing response time from 30 seconds per declaration to 5 minutes per declaration. In 2023, customs clearance delays caused by power issues averaged 48 hours per shipment.
II. Core Framework of the Emergency Response Plan: A Three-Tier “Risk Early Warning – Emergency Response – Recovery Assurance” System
To address strike and power issues at the Port of Durban, enterprises must establish a full-cycle emergency response plan. The core framework includes three components: “risk early warning mechanism,” “scenario-specific emergency response procedures,” and “recovery phase assurance measures,” ensuring early prediction before crises, rapid response during crises, and efficient recovery after crises.
(1) Risk Early Warning Mechanism: Building a Multi-Dimensional Information Monitoring Network
Effective risk early warning is the foundation of an emergency response plan. It requires integrating three types of information sources (“official channels,” “third-party institutions,” and “internal monitoring”) and establishing a three-level early warning system (red, yellow, blue):
1. Integration of Information Monitoring Channels
- Real-Time Tracking of Official Channels: Assign dedicated personnel to check the TNPA official website (for strike warning announcements), Eskom official website (for load shedding stage notifications), and South African Department of Labour website (for labor negotiation updates) daily. Subscribe to official email alert services (e.g., TNPA’s “Port Operations Alert”) to ensure timely access to strike plans (unions typically announce strikes 7 days in advance) and power outage schedules (Eskom releases the next day’s load shedding plan at 18:00 daily).
- Cooperation with Third-Party Institutions: Sign information service agreements with local South African logistics consulting firms (e.g., DHL Supply Chain South Africa, Imperial Logistics) to obtain more accurate strike impact forecasts (e.g., terminals likely to be affected by strikes, estimated duration) and alternative power supply solutions (e.g., power stability of surrounding backup yards).
- Internal On-Site Monitoring: If enterprises have on-site personnel at the Port of Durban, establish a “daily inspection system” to focus on monitoring worker gatherings (early signs of strikes) and equipment operation status (frequency of equipment failures during power instability). Maintain communication with port operators to obtain first-hand information (e.g., internal rumors of strike schedule changes).
2. Early Warning Level Standards and Response Triggers
| Warning Level | Criteria for Strikes | Criteria for Power Supply | Triggered Response Measures | 
| Blue Alert | Union issues strike intent notice; no specific date confirmed | Eskom implements Stage 1–2 load shedding (1–2 hours of daily outages) | Intensify information collection; compile list of cargo at port | 
| Yellow Alert | Union confirms strike date (within 7 days); begins organizing votes | Eskom implements Stage 3–4 load shedding (3–4 hours of daily outages) | Activate emergency team; develop cargo transfer plan | 
| Red Alert | Union vote approves strike; TNPA issues terminal shutdown warning | Eskom implements Stage 5+ load shedding (5+ hours of daily outages) | Fully activate emergency response; execute cargo transfer/detention response | 
(2) Scenario-Specific Emergency Response Procedures
Based on crisis type (strike/power) and warning level, develop differentiated emergency response procedures, focusing on three core areas: “disposition of cargo at port,” “adjustment of vessel berthing,” and “optimization of customs clearance processes.”
1. Emergency Response Procedure for Strikes (Taking Red Alert as an Example)
When a Red Alert is triggered (strike confirmed and terminal shutdown imminent), complete the following actions within 72 hours:
- Cargo Status Check and Priority Classification: Collaborate with customs brokers and freight forwarders to sort all cargo at port/in transit, classifying it by “urgency” into three categories: high-priority (perishable goods such as fresh produce and pharmaceuticals, cargo with upcoming delivery deadlines), medium-priority (industrial raw materials, general consumer goods), and low-priority (non-urgent replenishment goods). Prioritize disposal of high-priority cargo.
- Transfer of High-Priority Cargo: If cargo has not yet entered the terminal yard (stored in warehouses near the port), immediately transfer it to “strike backup yards” near the Port of Durban (e.g., yards in Durban Point Industrial Park, typically privately operated and unaffected by port strikes). Sign an “emergency storage agreement” with backup yards in advance, specifying storage rates (usually 20%–30% higher than normal yards) and cargo security measures (e.g., 24-hour security, fire-fighting equipment). If cargo has already entered the terminal yard, contact TNPA to apply for an “emergency container pickup permit” (requires proof of cargo urgency, such as a hospital’s demand letter for pharmaceuticals) and complete pickup within 24 hours before the strike, transferring it to backup yards.
- Adjustment of Vessel Berthing: If the vessel has not departed the port of origin, immediately negotiate with the shipping company to change the port of call, prioritizing Port Elizabeth (South Africa) or Port of Maputo (Mozambique) (8 hours and 6 hours by road from Durban, respectively, and less affected by Durban strikes). If the vessel is already en route (expected to arrive within 48 hours), contact TNPA to apply for “emergency berthing before the strike” and strive to complete unloading before the strike begins. If adjustments are not possible, arrange for the vessel to wait at anchor and purchase “demurrage insurance” (covering 50%–80% of demurrage costs).
- Preprocessing of Customs Clearance Documents: Communicate with South African Customs to submit customs clearance documents (e.g., commercial invoices, certificates of origin) for high-priority cargo in advance and apply for the “Priority Clearance” service (South African Customs offers this service for urgent cargo, with an additional fee of approximately 0.5% of the cargo value). Ensure customs clearance can be completed immediately after cargo transfer to minimize detention time.
2. Emergency Response Procedure for Power Supply (Taking Red Alert as an Example)
When a Red Alert is triggered (Stage 5+ load shedding), dynamically adjust operational plans on an “hourly basis”:
- Optimization of Operation Hours: Based on Eskom’s published load shedding schedule (e.g., 9:00–14:00 daily outages), adjust terminal operation hours. Schedule power-dependent operations such as container loading/unloading and pickup for periods with stable power supply (e.g., 00:00–06:00). Reserve “off-peak operation time slots” with TNPA in advance (requires an additional reservation fee of approximately USD 500 per session).
- Emergency Protection for Refrigerated Cargo: For refrigerated containers, prioritize transfer to professional refrigerated yards equipped with “dual-circuit power supply + backup generators” (e.g., Durban’s “Cool Chain Logistics Park”). If transfer is not possible, arrange on-site personnel to check refrigerated container temperatures every 2 hours to ensure generators are functioning properly. Simultaneously, communicate with insurance companies to confirm whether cargo losses caused by power outages are covered by insurance and prepare claim materials in advance (e.g., temperature records, photos of spoiled cargo).
- Backup Plan for Electronic Systems: If the customs electronic declaration system freezes due to power outages, immediately switch to the “manual declaration backup channel” (South African Customs has 2 emergency declaration windows at the Port of Durban, requiring advance reservation). Submit paper documents (3 copies required) and follow up on review progress via the customs emergency contact number (e.g., Durban Customs Clearance Emergency Hotline: +27 31 368 4000).
- Emergency Handling of Equipment Failures: If terminal equipment (e.g., cranes, forklifts) malfunctions due to power fluctuations, causing delays in cargo loading/unloading, immediately contact TNPA’s “emergency maintenance team” (requires an expedited maintenance fee of approximately USD 2,000 per incident). Simultaneously, prepare backup loading/unloading plans (e.g., renting mobile cranes from private yards).
(3) Recovery Phase Assurance Measures
After the crisis ends (strike concludes/load shedding reduced to Stage 2 or below), complete “supply chain recovery” and “experience review” within 7 days to prevent recurrence of similar issues:
- Supply Chain Recovery Measures:
- Priority Customs Clearance for Cargo: Negotiate with Customs to prioritize clearance of cargo delayed during strikes/power outages. Provide “delay certificates” (issued by TNPA or Eskom) to apply for customs clearance fee reductions (in some cases, up to 50% reduction in clearance fees).
- Coordination of Transportation Resources: Terminals typically experience “operational congestion” after strikes (e.g., over 80,000 TEUs backlogged in Durban yards after the August 2023 strike). Sign “emergency transportation agreements” with transport companies in advance to ensure trucks are arranged immediately after cargo clearance (avoiding additional storage fees from yard detention).
- Customer Communication and Compensation Negotiation: Promptly inform customers of cargo delays, provide proof of delay causes (e.g., strike notices, load shedding announcements), and negotiate extended delivery deadlines. If customer losses occur due to inadequate enterprise emergency measures, initiate compensation procedures per contract terms and record loss amounts as basis for subsequent insurance claims or recovery from responsible parties (e.g., TNPA).
- Experience Review and Plan Optimization:
- Emergency Effectiveness Evaluation: Hold an emergency response review meeting to assess the effectiveness of the early warning mechanism (e.g., whether advance warning time was sufficient), implementation of emergency measures (e.g., timeliness of cargo transfer, cost control), and statistics on loss amounts (direct losses such as detention fees, indirect losses such as customer churn).
- Plan Revision and Training: Revise the emergency response plan based on review results (e.g., add information on new backup yards, optimize cargo priority classification standards). Conduct regular emergency response training for internal teams (at least once per quarter) and use simulation exercises (e.g., simulating a Red Alert strike scenario) to improve team response capabilities.
III. Key Resources and Assurance Measures for Implementing the Emergency Response Plan
Effective implementation of the emergency response plan relies on three key elements: “local resource integration,” “insurance coverage,” and “legal support.” Enterprises must make advance arrangements to ensure rapid resource deployment during emergencies.
(1) Local Resource Integration: Building a “30-Minute Response Circle”
Emergency handling at the Port of Durban is highly dependent on local resources. Enterprises must establish long-term cooperative relationships with the following three types of institutions to ensure support within 30 minutes during emergencies:
- Backup Yards and Warehousing Service Providers: Select 3–5 backup yards within a 1-hour drive of the Port of Durban (prioritizing privately operated yards with independent power systems). Sign “annual emergency storage agreements” specifying emergency storage capacity (covering 50% of the enterprise’s monthly average cargo volume at port), pricing (capping emergency storage rates at 1.5 times normal rates), and cargo transfer response time (arranging vehicles within 2 hours).
- Transport Companies: Sign “emergency transportation agreements” with 2–3 local South African trucking companies (e.g., Unitrans, Super Group) to ensure access to at least 10 trucks with a capacity of 5 tons or more (for cargo transfer) during emergencies. Specify transportation timelines (e.g., 12-hour delivery from Durban to Port Elizabeth) and costs (fixed emergency transportation unit prices to avoid price hikes).
- Maintenance and Power Service Providers: If enterprises use their own equipment (e.g., refrigerated containers, transport vehicles) at the Port of Durban, sign “emergency service agreements” with local equipment maintenance companies (e.g., JCB South Africa) and power service providers (e.g., Aggreko, which provides temporary generator rentals). Ensure on-site maintenance within 2 hours for equipment failures and temporary generator deployment within 4 hours for power outages (pre-determine generator capacity, e.g., 500KVA or higher for refrigerated yards).